Of course after I start this we have rain for a few weeks, not a ton but enough to slow me down
South roof over cabana framed out, it will eventually extend over the bar area - total length will be 28'. I installed a ridge beam instead of a ridge board. The ridge beam will support the peak & 1/2 the roof & take some of the weight off the overhangs
North roof framed out, 2x4 skylight will be installed - framing hidden by sm tarp I put up
"Attic" overhang on front & back, you can just see the bottom of the framing for the skylight at the bottom edge of the tarp
The lower side needs to be textured & painted dark orange
The orange color we painted the back originally, it looked darker in the store. The back side of the new roof will be painted a dark green to blend in more with the woods. I haven't decided if I will repaint the lower side - have to see how much paint I have/need